AIB Homes
Bathroom Renovations
Walk-in showers, tiling and full bathroom remodels for Toronto homes.
Bathroom Renovations in Toronto

AIB Homes renovates main bathrooms, ensuites, powder rooms and basement bathrooms across Toronto and the GTA. We handle the full project — demolition, plumbing and electrical rough-ins, waterproofing, tiling, fixtures and finishes — with licensed trades and one point of contact.
Every project starts with a layout that fits the room you actually have, so storage, ventilation and daily use are planned before the first tile goes up.
- Design & Layout Planning
- Waterproofing & Tiling
- Walk-In Showers & Tubs
- Vanities & Storage
- Plumbing & Electrical
- Permits & Coordination
What We Cover
A complete bathroom remodel, one team
From waterproofing done right to the final piece of hardware.
Layout & Design
Plans that make the most of small or awkward bathrooms, from fixture placement to storage.
Waterproofing & Tiling
Proper membranes, sloped shower bases and precise tile work that lasts.
Showers, Tubs & Fixtures
Curbless and walk-in showers, glass enclosures, soaker tubs and quality fixtures.
Plumbing & Electrical
Rough-ins, relocations, heated floors, ventilation and lighting handled by licensed trades.
Vanities & Finishes
Custom vanities, stone countertops, mirrors and coordinated hardware.
Project Management
One point of contact for scheduling, trades and permits when the scope requires them.
How It Works
A clear four-step bathroom renovation process
Consultation
We review the existing bathroom, your goals, budget and timeline.
Design
Layout, fixtures, tile and finishes are selected and confirmed before work starts.
Build
Demolition, rough-ins, waterproofing, tiling and installation, coordinated on schedule.
Handover
Final walkthrough, deficiency review and care instructions for your new bathroom.
27+
Years of Experience
596+
Projects Delivered
100%
Licensed & Insured
5★
Client Rating

Built to Last
Bathrooms fail where water gets in. We install proper waterproofing membranes, correctly sloped shower bases and sealed transitions so tile and drywall stay dry for the long run.
Ventilation, heated floors, niche placement and lighting are planned during design rather than improvised on site — which keeps the schedule and the budget predictable.
FAQ
Bathroom renovation questions
How long does a bathroom renovation take in Toronto?
A typical full bathroom renovation runs about two to four weeks on site once materials are ordered and any required permits are in place. Timelines depend on the scope, fixture lead times and whether plumbing or electrical is being relocated.
What is included in a full bathroom renovation?
Projects usually include demolition, plumbing and electrical rough-ins, waterproofing, tiling, shower or tub installation, vanity and countertop, lighting, ventilation, painting and final fixture installation. The exact scope is confirmed during design.
Do you need a permit for a bathroom renovation?
Cosmetic updates generally do not require a permit, but moving plumbing, altering structure or adding a new bathroom often does. AIB Homes confirms the requirements for your scope and manages the permit process when it is needed.
Can you renovate a small or basement bathroom?
Yes. We regularly work on compact main-floor, ensuite and basement bathrooms, including adding a new three-piece bathroom to a finished basement with the necessary plumbing and waterproofing.
Planning a Bathroom Renovation?
Tell us about your space and we'll prepare a clear, fair quote.
